CALCULATION OF COSTS TO THIRD PARTIES OF SPECIALIZED SERVICES

The ”Dimitrie Gusti” National Village Museum Laboratory may provide the following services:
– Physico-chemical analysis;
– restoring painting;
– Restoration of metal;
– Restoration of textiles, leather;
– Restoration of ceramics;
– Restoration of wood;
– Preservation of wood monuments;
– Treatments for the preservation of wooden objects, textiles, leather, etc .;
– Wood fireproofing treatments.
The value of these works includes the following elements:
– labor costs: number of hours estimated to be required for each operation x time value;
– material expenses: disposable instruments, consumables, other expenses;
– travel expenses, as appropriate;
– directing expenses of 25%
– institution benefit (10%).
For each specialty, the explanation of material and labor costs is presented in the following appendixes as appropriate. If the degree of complexity of the work carried out required a working time, material costs lower or higher than the estimated values, a post worksheet estimate will be prepared.

PHYSICO-CHEMICAL ANALYZES LABORATORY

1. Sampling
Labor costs (8 hours x 9 lei / hour) ……………………………… 76 lei
Material Expenses ……………………………………………………… 8 lei

2. Preliminary examination
Labor costs (0.5 hours x 9 lei / hour) ……………………………. 4.5 lei
Material Expenses ………………………………………………………. 2 lei

3. Analysis by microchannel tests
Labor costs (2 hours x 9 lei / hour) ………………………………. 18 lei
Material Expenses …………………………………………………… .. 25 lei

4. Analysis by binder coloring tests
Labor costs (2 hours x 9 lei / hour) ………………………. ……… 18 lei
Material Expenses ………………………………………………… …… 25 lei

5. Analysis by melting point measurement
Labor costs (2 hours x 9 lei / hour) ………………………………. 18 lei
Material Expenses …………………………………………………… .. 20 lei

6. Fourier Transform Infrared Spectrometry Analysis
Labor costs (6 hours x 9 lei / hour) ………………………………. 18 lei
Material Expenses …………………………………………………….. 30 lei

7. Analysis by X-ray spectrometry
Labor costs (4 hours x 9 lei / hour) ………………………………. 18 lei
Material Expenses ……………………………………………………… 20 lei

8. PH determinations
Labor costs (1 hour x 9 lei / hour) …………… …………………. 9 lei
Material Expenses …………………………………………………… 20 lei

9. Microfotography of samples taken, microchimic tests and binders / photo tests
Labor costs (0.5 hours x 9 lei / hour) / photo ………………………… 4.5 lei
Material / Photo Expenses …………………………………………………….. 2 lei

10. Embedding samples in resin, cutting and grinding
Labor costs (16 hours x 9 lei / hour) ……………………. ……… 144 lei
Material Expenses ………………………………………………………. 20 lei

11. Microscope examination
Labor costs (0.5 hours x 9 lei / hour) …………… ……………… .. 4.5 lei
Material / Photo Expenses ……………………………………………… 2 lei

12. Draw a stratigraphic file
Labor costs (1.5 hours x 9 lei / hour) ……………………………… 13.5 lei
Material Expenses …………………………………………………………… 2 lei

13. Draw X-ray Analysis Sheet
Labor costs (1.5 hours x 9 lei / hour) ……………………………… 13.5 lei
Material Expenses …………………………………………………………… 2 lei

14. Preparation of FTIR Infrared Analysis Sheet
Labor costs (1.5 hours x 9 lei / hour) ……………………………. 13.5 lei
Material Expenses …………………………………………………………. 2 lei

15. Making a microchip and binder
Labor costs (1.5 hours x 9 lei / hour) ………………… …………… .13.5 lei
Material Expenses ……………………………………………………………. 2 lei

16. Preparation of pH determination, melting point
Labor costs (1 hour x 9 lei / hour) ……………………………………… 9 lei
Material Expenses …………………………………………………… ……… 2 lei

17. Draw up an objective analysis report
Labor costs (3 hours x 9 lei / hour) ……………………………………. 27 lei
Material Expenses …………………………………………………………… 10 lei

CONSERVATION LABORATORY

1. Preliminary objective review (insect-fungicide or flame-retardant treatment)
Labor costs (4 hours x 7.8 lei / hour) ………………… ……………… .27.2 lei
Material Expenses ……………………………………………… .. …………… 40 lei

2. Cleaning and preparation of wood / mp (insect-fungicide or flame retardant)
Labor costs (0.5 hours x 5.2 lei / hour) ……………… ………………. 2.6 lei
Material Expenses ……………………………………………………………. 10 lei

3. Brush / spray treatment (insect-fungicide or flame retardant)
Labor costs (0.8 hours x 5.2 lei / hour) …………… ………………… 4.16 lei
Material Expenses ……………………………………. Specific Consumption

4. Spray / spray treatment (insect-fungicide or flame retardant)
Labor costs (0.6 hours x 5.2 lei / hour) ……………… ………………. 3.12 lei
Material expenditure ……………………………………specific consumption

5. Injection treatment / m²
Labor costs (3 hours x 5.2 lei / hour) …………… ………… .. ……… ..15.6 lei
Material Expenses ……………………………………….. Specific Consumption

6. Make a treatment / lens quality sheet
Labor costs (8 hours x 7.8 lei / hour) ………………… ……………… .54.4 lei
Material Expenses ……………………………………………………………… 20 lei

7. Prepare working / objective report (treatment or fireproofing)
Labor costs (8 hours x 7.8 lei / hour) ……………… ………………… ..54.4 lei
Material Expenses ………………………………………………………………. 45 lei

8. Fireproofing sample + fire test test bulletin
Labor costs (8 hours x 7.8 lei / hour) ………………… ……………….. .54.4 lei
Material Expenses ……………………………………………………… ………..20 lei
Firefighter Certificate Fee …………………………………………………… .300 lei

9. Thermal textiles, leather, carpets
Labor costs (3 hours x 5.2 lei / hour) / 10 items ……………………… 15.6 lei
Material Expenses ………………………………………………………………. ..15 lei

METAL RESTORATION LABORATORY

1. Preliminary object review, documentation
Labor costs (4 hours x 5.2 lei / hour) …………… ……………. .20.8 lei
Material Expenses ……………………………………………… ………. 20 lei

2. Preparation of solutions / function of the part support
Labor costs (2 hours x 5.2 lei / hour) …………… ……………… .10.4 lei
Material Expenses ……………………………………………………….. 60 lei

3. Degreasing the object
Labor costs (6 hours x 5.2 lei / hour) …………… ……………… ..31.2 lei
Material Expenses …………………………………………………………. 40 lei

4. Cleaning the object
Labor costs (8 hours x 5.2 lei / hour) …………… ……………….. 41.6 lei
Material Expenses …………………………………………………………. 80 lei

5. Neutralization – drying
Labor costs (8 hours x 5.2 lei / hour) ………… ………………… .. 41.6 lei
Material Expenses ……………………………………………………….. .100 lei

6. Final Conservation
Labor costs (2 hours x 5.2 lei / hour) ………… …………….. 10.4 lei
Material Expenses ………………………………………………… .. 80 lei

7. Create a restoration report
Labor costs (8 hours x 5.2 lei / hour) ………………………. ..41.6 lei
Material Expenses ……………………………………………………. 40 lei

CERAMIC RESTORATION LABORATORY

1. Preliminary object review, documentation
Labor costs (4 orex 4.7 lei / hour) ……………… ……………… 18.8 lei
Material Expenses ……………………………………………… …….. 20 lei

2. Cleaning in neutral detergent solution
Labor costs (1 hour x 4.7 lei / hour) …………… ………………. 4.7 lei
Material Expenses …………………………………………………………. 5 lei

3. Cleaning with solvents
Labor costs (8 hours x 4.7 lei / hour) ………… …………………. 37.6 lei
Material Expenses ………………………………………………… ……….8 lei

4. Assemble up to 5 fragments
Labor costs (2 hours x 4.7 lei / hour) ………… …………………….9.4 lei
Material Expenses ………………………………………………………… 14 lei

5. Assembling over 5 fragments
Labor costs (5 hours x 4.7 lei / hour) ……………………………… 23.5 lei
Material Expenses ………………………………………………………… .15 lei

6. Fill missing and finishing fragments
Labor costs (4 hours x 4.7 lei / hour) ………………… ………… .18.8 lei
Material Expenses ………………………………………………………… 15 lei

7. Catching and finishing
Labor costs (8 hours x 4.7 lei / hour) ……………… …………… .37.6 lei
Material Expenses ……………………………………………………… 51.3 lei

8. Bankruptcy and settlement operations
Labor costs (5 hours x 4.7 lei / hour) ……………… …………… ..23.5 lei
Material Expenses ………………………………………………………… .48 lei

9. Color Retouch
Labor costs (16 hours x 4.7 lei / hour) ………………………… 75.2 lei
Material Expenses …………………………………………………… .. 20 lei

10. Paranoid impregnation for brittle enamel
Labor costs (1 hour x 4.7 lei / hour) …………… ……………… .. 4.7 lei
Material Expenses ……………………………………………………. .. 20 lei

11. Prepare a restoration report
Labor costs (8 orex 4.7 lei / hour) ……………………………. ..37.6 lei
Material Expenses ……………………………………………………… 40 lei

PICTURE RESTORATION LABORATORY

Painting tempera on wood

1. Preliminary object review, documentation
Labor costs (16 hours x 7 lei / hour) ……………… ……………… 112 lei
Material Expenses ……………………………………………… .. ….. .. 30 lei

2. Cold Paint Coating Consolidation / cmp
Labor costs (0.01 hours x 7 lei / hour) / cmp …………………. 0.07 lei
Material expenditure / cmp ………………………………………… 0.03 lei

3. Heat / cmp paint consolidation
Labor costs (0.03 hours x 7 lei / hour) / cmp …………………. 0.21 lei
Material costs / cmp ……………………………………………………0.05 lei

4. Filling gaps (cleaning, grouting, finishing) / cmp
Labor costs (0.05 hours x 7 lei / hour) / cmp ………………….. 0.35 lei
Material Expenses / cmp……………………………………………….0.05 lei

5. Cleaning the paint layer / cmp
Labor costs (0.05 hours x 7 lei / hour) / cmp…………………….0.35 lei
Material expenditure / cmp ………………………………………. 0.08 lei

6. Color Integration / cmp
Labor costs (0.07ore x 7 lei / hour) / cmp ……………………… 0.49 lei
Material Expenses / cmp……………………………………………. 0.08 lei

7. Vernalization of the icon / cmp
Labor costs (0.01 hours x 7 lei / hour) / cmp …………………. 0.07 lei
Material expenditure / cmp…………………………………………. 0.05 lei

8. Cleaning the wood / cem
Labor costs (0.03 orex 7 lei / hour) / cmp……………………..0.21 lei
Material expenses /cmp……………………………………………. 0.02 lei

9. Filling the gaps of the wood support / cmp
Labor costs (0.04 hours x 7 lei / hour) / cmp ………………. 0.28 lei
Material costs / cmp ……………………………………………….. 0.02 lei

10. Restoration operations of wood support
Labor costs (8 hours x 5.2 lei / hour) / cmp. 41.6
Material Expenses ……………………………………………………15 lei

11. Insect-fungicide treatment
Labor costs (3 hours x 7 lei / hour) ………………… ………….21 lei
Material Expenses ……………………………………………………..5 lei

12. Chromatic integration of the wood support / cmp
Labor costs (0.03 hours x 7 lei / hour) / cmp
Material expenditure / cmp ……………………………………. 0.02 lei

13. Filming the icon versus / cmp
Labor costs (0.01 hours x 7 lei / hour) / cmp…………………… 0.07 lei
Material Expenses / cmp……………………………………………… 0.08 lei

14. Closure of xylophage insect flying holes / cmp
Labor costs (0.02 hours x 7 lei / hour) / cmp…………………..0.14 lei
Material expenditure / cmp ……………………………………….. 0.08 lei

15. Prepare the restoration report
Labor costs (8 hours x 7 lei / hour) ………………………………..56 lei
Material Expenses ……………………………………………………… 40 lei

GLASS PAINTING

16. Preliminary object examination, documentation
Labor costs (16 hours x 7 lei / hour) ………………… …………112 lei
Material Expenses ………………………………………………………30 lei

17. Disassemble the icon
Labor costs (0.01 hours x 7 lei / hour) / cmp ……………. 0.07 lei
Material costs / cmp ……………………………………………….0.01 lei

18. Strengthen color film / cmp
Labor costs (0.03 hours x 7 lei / hour) / cmp ……………. 0.21 lei
Material costs / cmp …………………………………………….. 0.01 lei

19. Cleaning the face of the glass and edges / cmp
Labor costs (0.02 hours x 7 lei / hour) / cmp
Material Expenses / cmp……………………………………….0.01 lei

20. Filling the glass / lacquer gaps
Labor costs (0.04 hours x 7 lei / hour) / cmp …………………. 0.28 lei
Material costs / cmp ………………………………………………….. 0.05 lei

21. Color Integration / cmp
Labor costs (0.07ore x 7 lei / hour) /cmp/0.49……………………0.28 lei
Material expenditure / cmp……………………………………………. 0.05 lei

22. Cleaning the frame and protective cover / cmp
Labor costs (0.01 hours x 7 lei / hour) / cmp …………………….. 0.07 lei
Material expenditure / cmp…………………………………………….. 0.05 lei

TEXTILE, LEATHER RESTORATION LABORATORY

1. Preliminary objective review, documentation
Labor costs (4 hours x 6.8 lei / hour) …………………… ………… 27.2 lei
Material Expenses ………………………………………………………….. 20 lei

2. Dry conservation (solvents, stain removal) /.mp
Labor costs (1 hour x 5.2 lei / hour) ……………………………………5.2 lei
Material expenditure / m² ………………………………………………..5.2 lei

3. Wet Conservation (immersion in neutral detergent solution) / m²
Labor costs (1.5 hours x 5.2 lei / hour) /mp% ……………………..7.8 lei
Material expenditure / m² ………………………………………………. 3.3 lei

4. Restoring degraded areas by integration – knots / knots
Labor costs (0.5 hours x 6.8 lei / hour) / cmp……………………..23.4 lei
Material costs / cmp .. …………………………………………………….. .1 leu

5. Restoration of degraded areas by integration – silk / cmp
Labor costs (0.3 hours x 6.8 lei / hour) / cmp………… ..24.04 lei
Material costs / cmp ………………………………………………… .1 leu

6. Restoration of degraded zones by integration – cotton / cmp
Labor costs (0.3 hours x 6.8 lei / hour) / cmp……………24.04 lei
Material costs / cmp ………………………………………………… .1 leu

7. Restoration of degraded areas by integration – wool fabrics / cmp
Labor costs (0.2 hours x 6.8 lei / hour) / cmp…………………..1.36 lei
Material Expenses / cmp………………………………………………….1 leu

8. Strengthening on textile by sewing / sqm
Labor costs (20 hours x 5.2 lei / hour) / sqm ……………………. 104 lei
Material expenditure / m² ………………………………………………. 30 lei

9. Strengthening on textile with adhesives / m2
Labor costs (8 orex 5.2 lei / hour) /mp%…………………………….41.6 lei
Material expenditures / mp ……………………………………………… 45 lei

10. Skin, fur / object cleaning
Labor costs (8 hours x 5.2 lei / hour) / object………………………41.66 lei
Material / Object Expenses …………………………………………………. 10 lei

11. Embroidery embroidery / leather
Labor costs (0.3 hours x 5.2 lei / hour / cmp ……………………… 1.56 lei
Material costs / cmp ……………………………………………………….. .1.5 lei

12. Replacement of degraded fur / coat areas
Labor costs (40 hours x 5.2 lei / hour) / cocoa ……………………….. 208 lei
Material Expenses ………………………………………………………………… 50 lei

13. Reinforcing leather, fur / object objects
Labor costs (8 hours x 5.2 lei / hour) / object ………………………….. 41.6 lei
Material expenditure / object…………………………………………………… 10 lei

14. Prepare the restoration report
Labor costs (8 hours x 6.8 lei / hour) ……………………………………… 54.4 lei
Material Expenses …………………………………………………………………. 40 lei

WOOD RESTORATION LABORATORY

1. Preliminary object review, documentation
Labor costs (4 hours x 6.8 lei / hour) ……………………………………. 27.2 lei
Material Expenses …………………………………………………………………20 lei

2. Cleaning / cmp
Labor costs (0.02 hours x 5.2 lei / hour) …………………… ………… 0.104 lei
Material Expenses …………………………………………………………….. .0.02 lei

3. Insect fungicide treatment by brush / square meter
Labor costs (0.8 hours x 5.2 lei / hour) …………… ……………………4.16 lei
Material Expenses ………………………………………… Specific Consumption

4. Insect-fungicide treatment by injection / mp
Labor costs (3 hours x 5.2 lei / hour) ………………………………………15.6 lei
Material Expenses ………………………………………… Specific Consumption

5. Filling loops / cmp
Labor costs (0.04 hours x 5.2 lei / hour) …………………………….. 0.208 lei
Material Expenses ……………………………………………………………..0.02 lei

6. Obstruction of flight holes / cmp
Labor costs (0.02 hours x 5.2 lei / hour) ……… …………………… 0.104 lei
Material Expenses ………………………………………………………….. .0.08 lei

7. Reconstruction of ornaments, decor / cmp
Labor costs (1 hour x 5.2 lei / hour) …………………………………… 5.2 lei
Material Expenses …………………………………………………………… 15 lei

8. Color Integration / cmp
Labor costs (0.03 hours x 5.2 lei / hour) ………………………….. 0.156 lei
Material Expenses ………………………………………………………… .0.02 lei

9. Filming / cmp
Labor costs (0.01 hours x 5.2 lei / hour) / cmp…………….. 0.052 lei
Material costs / cmp ………………………………………………… 0.08 lei

10. Prepare a restoration report
Labor costs (8 hours x 5.2 lei / hour) …………………………….. 41.6 lei
Material Expenses …………………………………………………………. 40 lei